in City of St. Louis, MO

Likely required

Probably yes. The City has a residential electrical permit fee for service and panel work: $25 application + $60 to $100 per unit depending on scope.

Jurisdiction
City of St. Louis, Missouri
Project
Electrical panel (electrical panel or service work)
Issued by
City of St. Louis Building Division
Fee data
Fees partly verified
Checked
Nov 28, 2026
Sheet no.
GP-MO-STL-07
01

Do you need a permit?

  • The electrical permit fee schedule has residential rows for repair/modify, service only, and repair/modify with service.[1]
  • Separate electrical permits are required when applicable.[2]
02

What it costs

ItemAmountNotes & source
Application fee$25[1]
Residential — repair or modify existing wiring (no new service)$60 per unit[1]
Residential — repair/modify with new service$100 per unit[1]
Residential — new service only$60 per unit in the fee table; $100 per unit in the explanatory noteThe City page shows $60 in the table row and $100 in its note for this case. Ask the office which applies.[1]
Re-inspection$30 each[1]

Fees as posted on the Building Division pages; no effective date is shown on the pages (checked Nov 28, 2026).

03

Where and how to apply

Building Division — Permit Section, City of St. Louis

1200 Market St., Room 425, St. Louis, MO 63103
Phone (314) 622-3313 · Mon–Fri 8:00 a.m.–4:30 p.m. (Hot Spot Desk 9:00 a.m.–3:00 p.m.)
stlcitypermits@stlouis-mo.gov[2]

Apply →

City of St. Louis online permit application[3]

  1. Apply online or in person at City Hall, Room 425. Online file types accepted: gif, jpeg, jpg, png, bmp, pdf, doc, docx; in person bring 5 copies of plans.
  2. If you are not the owner of record, bring a letter of authorization.
  3. Pay the application fee when you file; the permit fee is due when approvals are complete and the permit is ready to issue.
04

What we could not verify

What we could not verify or what to confirm
  • The City’s own table and note disagree on the “service only” fee ($60 vs. $100).
  • No page we read states outright that a panel replacement needs a permit.
05

Sources

Every figure above comes from the government pages below. Verbatim excerpts and raw downloads are archived with the site data. Not legal advice; see the disclaimer.

  1. Electrical Permit Fees (City Ordinance 70802) City of St. Louis Building DivisionChecked Nov 28, 2026 · Downloaded (HTTP 200); raw page saved
  2. When a Residential Building Permit is Needed City of St. Louis Building DivisionChecked Nov 28, 2026 · Read through a web-fetch/search tool (the site blocks direct downloads); verbatim excerpt saved in raw/
  3. Apply for a Building Permit (fees) City of St. Louis Building DivisionChecked Nov 28, 2026 · Downloaded (HTTP 200); raw page saved