gotapermit
Sheet 03 / City of St. Louis

Roof replacement permit
in City of St. Louis, MO

It depends

A like-for-like re-roof (same type of covering, up to two layers, 25% or less of the sheathing replaced) needs no permit. A different material, or replacing more than 25% of the sheathing, does.

Jurisdiction
City of St. Louis, Missouri
Project
Roof replacement (re-roofing)
Issued by
City of St. Louis Building Division
Fee data
Fees verified
Checked
Nov 28, 2026
Sheet no.
GP-MO-STL-03
01

Do you need a permit?

  • No permit: roof replacement with like material and replacement of 25% or less of the roof sheathing.[1]
  • Permit required: an entire new roof when the work is not replacement of like material, and/or more than 25% of the roof sheathing is removed and replaced.[1]
  • Code text: recovering or replacing roof covering with the same type of covering to a maximum of two layers is exempt; low-slope roofs (¼:12 to under 4:12) must provide positive drainage.[2]
02

What it costs

ItemAmountNotes & source
Application fee$25.00Due when you file. In-person filing: check or cash only. Non-refundable.[3]
Permit fee$19 up to $1,000 · $23 for $1,001–$2,000 · $30 for $2,001–$3,000 · over $3,000: $10.00 per thousand of estimated construction cost, or fraction thereofDue after final approval, before the permit is issued. The page does not say whether the per-thousand rate applies to the whole cost or only the part above $3,000. Use the City’s own Permit Cost Estimator in the online application to get the exact figure.[3]

Fees as posted on the Building Division pages; no effective date is shown on the pages (checked Nov 28, 2026).

03

Where and how to apply

Building Division — Permit Section, City of St. Louis

1200 Market St., Room 425, St. Louis, MO 63103
Phone (314) 622-3313 · Mon–Fri 8:00 a.m.–4:30 p.m. (Hot Spot Desk 9:00 a.m.–3:00 p.m.)
stlcitypermits@stlouis-mo.gov[1]

Apply →

City of St. Louis online permit application[3]

  1. Apply online or in person at City Hall, Room 425. Online file types accepted: gif, jpeg, jpg, png, bmp, pdf, doc, docx; in person bring 5 copies of plans.
  2. If you are not the owner of record, bring a letter of authorization.
  3. Pay the application fee when you file; the permit fee is due when approvals are complete and the permit is ready to issue.
04

What we could not verify

What we could not verify or what to confirm
  • The City page does not state whether the “$10 per thousand” rate counts the first $3,000; we do not compute a total. Use the Permit Cost Estimator next to “Start Application”.
  • Fees apply only when a permit is required.
  • Historic-district properties may need Cultural Resources approval for exterior work even when no building permit is required.
05

Sources

Every figure above comes from the government pages below. Verbatim excerpts and raw downloads are archived with the site data. Not legal advice; see the disclaimer.

  1. When a Residential Building Permit is Needed City of St. Louis Building DivisionChecked Nov 28, 2026 · Read through a web-fetch/search tool (the site blocks direct downloads); verbatim excerpt saved in raw/
  2. Residential Code §R105 Permits (Chapter 25.11, City of St. Louis Revised Code) Municode / City of St. LouisChecked Nov 28, 2026 · Read through a web-fetch/search tool (the site blocks direct downloads); verbatim excerpt saved in raw/Search-index excerpt of Municode; confirm the full text in a browser.
  3. Apply for a Building Permit (fees) City of St. Louis Building DivisionChecked Nov 28, 2026 · Downloaded (HTTP 200); raw page saved