Sheet 09 / St. Louis CountySwimming pool permit
It depends
Swimming pool permit
in St. Louis County, MO
It dependsYes for in-ground pools and most above-ground pools. Only a prefabricated, entirely above-ground pool no deeper than 24 inches and under 5,000 gallons is exempt.
- Jurisdiction
- St. Louis County, Missouri
- Project
- Swimming pool
- Issued by
- St. Louis County Dept. of Transportation & Public Works
- Fee data
- Fees verified
- Checked
- Nov 28, 2026
- Sheet no.
- GP-MO-SLC-09
01
Do you need a permit?
- Permit not required for prefabricated swimming pools accessory to one- and two-family dwellings with a maximum water depth of 24 inches and a maximum volume of 5,000 gallons, installed entirely above ground.[1]
- The Ordinance Guidebook lists “A swimming pool” among work requiring a building permit.[2]
- Fences enclosing pools, spas and hot tubs are not exempt from permits.[1]
02
What it costs
| Item | Amount | Notes & source |
|---|---|---|
| Residential swimming pool | Table 1100.060 fee for your estimated construction cost, plus the $47 permit processing fee | Table 1100.060 expressly covers residential swimming pools.[3] |
Fee schedule: Ordinance 29,445, adopted Nov 4, 2025. Processing fees may be revised each July 31.
03
Where and how to apply
Residential Building, St. Louis County Dept. of Transportation and Public Works
41 South Central Ave., 6th Floor, Clayton, MO 63105
Phone 314-615-5184 · Mon–Fri 7:30 a.m.–4:00 p.m.[4]
St. Louis County Services Portal (Accela)[5]
- Start a new application in the County portal, or call Residential Building.
- Estimated construction cost drives the building fee; the Code Official may estimate it by square-foot cost or accept a signed contract or owner affidavit (§1100.040).
04
What we could not verify
What we could not verify or what to confirm
- Electrical and plumbing permits for pumps, heaters or bonding are separate; see the electrical and plumbing fee lines.
- Pool barrier and drainage rules are in the swimming pool and spa code and are not summarized here.
Same project, other places
- Swimming pool permit in City of St. Louis — It depends
- Swimming pool permit in Fenton — Permit required
- Compare all places for swimming pool
05
Sources
Every figure above comes from the government pages below. Verbatim excerpts and raw downloads are archived with the site data. Not legal advice; see the disclaimer.
- SLCRO Chapter 1115 Building Code §105.1, §105.1.2, §105.2 (2015 ICC codes, user-friendly edition, Ord. 27,654) St. Louis County Dept. of Transportation and Public Works · User-friendly edition dated Apr 1, 2020Checked Nov 28, 2026 · Read through a web-fetch/search tool (the site blocks direct downloads); verbatim excerpt saved in raw/Same sections appear on Municode (codified through Ord. 29,532, Feb 17, 2026): library.municode.com/mo/st._louis_county. Confirm the current adopted edition before launch.
- St. Louis County Ordinance Guidebook — Building Codes & Permits (Unincorporated, Contractual) St. Louis County PlanningChecked Nov 28, 2026 · Read through a web-fetch/search tool (the site blocks direct downloads); verbatim excerpt saved in raw/Plain-language chart; where it differs from the code (fence height) both are shown.
- St. Louis County Ordinance No. 29,445 (2025), amending Chapter 1100 “Code Enforcement Fee Schedule” St. Louis County Council · Adopted Nov 4, 2025; approved Nov 5, 2025Checked Nov 28, 2026 · Full text retrieved; saved in raw/slc/Processing fees may be revised each July 31 (§1100.035).
- Residential Building (contact page) St. Louis County Dept. of Transportation and Public WorksChecked Nov 28, 2026 · Read through a web-fetch/search tool (the site blocks direct downloads); verbatim excerpt saved in raw/
- St. Louis County Services Portal (Accela) St. Louis CountyChecked Nov 28, 2026 · Read through a web-fetch/search tool (the site blocks direct downloads); verbatim excerpt saved in raw/