Sheet 05 / St. Louis CountyWater heater permit
Permit required
Water heater permit
in St. Louis County, MO
Permit requiredYes. Replacing a water heater needs a plumbing permit; the County prices it as a flat $47 total fee.
- Jurisdiction
- St. Louis County, Missouri
- Project
- Water heater (water heater replacement)
- Issued by
- St. Louis County Dept. of Transportation & Public Works
- Fee data
- Fees verified
- Checked
- Nov 28, 2026
- Sheet no.
- GP-MO-SLC-05
01
Do you need a permit?
- Permit required to “replace any electrical, gas, mechanical or plumbing system” regulated by the code.[1]
- Table 1100.200 lists “Domestic water heater replacements (total fee)” at $47.00, and domestic water heater replacements are not charged the separate $47 processing fee.[2]
- Water heaters over 120 gallons are priced as units under the mechanical unit table (§1100.140(a)).[2]
02
What it costs
| Item | Amount | Notes & source |
|---|---|---|
| Domestic water heater replacement | $47.00 total | Total fee; no separate processing fee for this permit type.[2] |
| Extra or re-inspection | $47 each | [2] |
Fee schedule: Ordinance 29,445, adopted Nov 4, 2025. Processing fees may be revised each July 31.
03
Where and how to apply
Residential Building, St. Louis County Dept. of Transportation and Public Works
41 South Central Ave., 6th Floor, Clayton, MO 63105
Phone 314-615-5184 · Mon–Fri 7:30 a.m.–4:00 p.m.[3]
St. Louis County Services Portal (Accela)[4]
- Start a new application in the County portal, or call Residential Building.
- Estimated construction cost drives the building fee; the Code Official may estimate it by square-foot cost or accept a signed contract or owner affidavit (§1100.040).
04
What we could not verify
What we could not verify or what to confirm
- Licensed-plumber requirements were not reviewed here.
Same project, other places
- Water heater permit in City of St. Louis — Likely required
- Water heater permit in Fenton — Permit required
- Compare all places for water heater
05
Sources
Every figure above comes from the government pages below. Verbatim excerpts and raw downloads are archived with the site data. Not legal advice; see the disclaimer.
- SLCRO Chapter 1115 Building Code §105.1, §105.1.2, §105.2 (2015 ICC codes, user-friendly edition, Ord. 27,654) St. Louis County Dept. of Transportation and Public Works · User-friendly edition dated Apr 1, 2020Checked Nov 28, 2026 · Read through a web-fetch/search tool (the site blocks direct downloads); verbatim excerpt saved in raw/Same sections appear on Municode (codified through Ord. 29,532, Feb 17, 2026): library.municode.com/mo/st._louis_county. Confirm the current adopted edition before launch.
- St. Louis County Ordinance No. 29,445 (2025), amending Chapter 1100 “Code Enforcement Fee Schedule” St. Louis County Council · Adopted Nov 4, 2025; approved Nov 5, 2025Checked Nov 28, 2026 · Full text retrieved; saved in raw/slc/Processing fees may be revised each July 31 (§1100.035).
- Residential Building (contact page) St. Louis County Dept. of Transportation and Public WorksChecked Nov 28, 2026 · Read through a web-fetch/search tool (the site blocks direct downloads); verbatim excerpt saved in raw/
- St. Louis County Services Portal (Accela) St. Louis CountyChecked Nov 28, 2026 · Read through a web-fetch/search tool (the site blocks direct downloads); verbatim excerpt saved in raw/