gotapermit
Sheet 05 / St. Louis County

Water heater permit
in St. Louis County, MO

Permit required

Yes. Replacing a water heater needs a plumbing permit; the County prices it as a flat $47 total fee.

Jurisdiction
St. Louis County, Missouri
Project
Water heater (water heater replacement)
Issued by
St. Louis County Dept. of Transportation & Public Works
Fee data
Fees verified
Checked
Nov 28, 2026
Sheet no.
GP-MO-SLC-05
01

Do you need a permit?

  • Permit required to “replace any electrical, gas, mechanical or plumbing system” regulated by the code.[1]
  • Table 1100.200 lists “Domestic water heater replacements (total fee)” at $47.00, and domestic water heater replacements are not charged the separate $47 processing fee.[2]
  • Water heaters over 120 gallons are priced as units under the mechanical unit table (§1100.140(a)).[2]
02

What it costs

ItemAmountNotes & source
Domestic water heater replacement$47.00 totalTotal fee; no separate processing fee for this permit type.[2]
Extra or re-inspection$47 each[2]

Fee schedule: Ordinance 29,445, adopted Nov 4, 2025. Processing fees may be revised each July 31.

03

Where and how to apply

Residential Building, St. Louis County Dept. of Transportation and Public Works

41 South Central Ave., 6th Floor, Clayton, MO 63105
Phone 314-615-5184 · Mon–Fri 7:30 a.m.–4:00 p.m.[3]

Apply →

St. Louis County Services Portal (Accela)[4]

  1. Start a new application in the County portal, or call Residential Building.
  2. Estimated construction cost drives the building fee; the Code Official may estimate it by square-foot cost or accept a signed contract or owner affidavit (§1100.040).
04

What we could not verify

What we could not verify or what to confirm
  • Licensed-plumber requirements were not reviewed here.
05

Sources

Every figure above comes from the government pages below. Verbatim excerpts and raw downloads are archived with the site data. Not legal advice; see the disclaimer.

  1. SLCRO Chapter 1115 Building Code §105.1, §105.1.2, §105.2 (2015 ICC codes, user-friendly edition, Ord. 27,654) St. Louis County Dept. of Transportation and Public Works · User-friendly edition dated Apr 1, 2020Checked Nov 28, 2026 · Read through a web-fetch/search tool (the site blocks direct downloads); verbatim excerpt saved in raw/Same sections appear on Municode (codified through Ord. 29,532, Feb 17, 2026): library.municode.com/mo/st._louis_county. Confirm the current adopted edition before launch.
  2. St. Louis County Ordinance No. 29,445 (2025), amending Chapter 1100 “Code Enforcement Fee Schedule” St. Louis County Council · Adopted Nov 4, 2025; approved Nov 5, 2025Checked Nov 28, 2026 · Full text retrieved; saved in raw/slc/Processing fees may be revised each July 31 (§1100.035).
  3. Residential Building (contact page) St. Louis County Dept. of Transportation and Public WorksChecked Nov 28, 2026 · Read through a web-fetch/search tool (the site blocks direct downloads); verbatim excerpt saved in raw/
  4. St. Louis County Services Portal (Accela) St. Louis CountyChecked Nov 28, 2026 · Read through a web-fetch/search tool (the site blocks direct downloads); verbatim excerpt saved in raw/